tva paradise 300KNOXVILLE, Tenn. (8/21/14) ― The Tennessee Valley Authority board of directors approved a $10.7 billion budget for fiscal 2015 that achieves a sustainable $500 million savings in operations spending and a record $3.5 billion in capital investment in generating plants and system improvements.

“This budget reflects our continuing efforts to reduce our O&M spending while modernizing and diversifying our generating fleet with cleaner and more efficient technology, continuing our stewardship activities, and growing jobs and capital investment in the region,” TVA President and CEO Bill Johnson said.

Even with the $500 million reduction in O&M spending, a small rate increase is necessary for new power capacity and environmental enhancements. This will ensure TVA’s power system meets the current and future needs of the 9 million residents of the Tennessee Valley.

The budget contains a 1.5 percent rate increase, slightly below the rate of inflation in the Consumer Price Index, amounting to about $1.70 more a month for the average Valley resident using 1,000 kilowatt-hours a month. The increase will take effect with the FY2015 budget year that begins Oct. 1, 2014.

“We have carefully considered the impact this might have on our customers and the businesses, industries and people of the region,” said Johnson. “This small rate adjustment – in addition to our internal cost reductions – is necessary to meet revenue requirements for 2015.”

TVA reduced its debt by $1.2 billion in FY2014 while continuing to invest in its power system to deliver reliable, lower-cost and cleaner electricity. The 2015 capital budget includes about $1 billion in base capital to fund continued operation of current assets, with the rest funding the completion of Watts Bar Nuclear Unit 2, a new gas plant at Paradise, environmental controls at Gallatin Fossil Plant, new generation at Allen Fossil Plant, significant transmission work, and other items.

As part of TVA’s efforts to move to a more diverse, flexible and cleaner generation fleet, the board approved replacing the Allen coal-fired plant with a new combined-cycle gas plant. Under TVA’s 2011 Clean Air Agreements with the Environmental Protection Agency and others, TVA must either retire the Memphis-area coal plant or put on environmental controls by December 2018.

“Replacing the existing plant with a gas unit is more economical than retrofitting it with environmental controls,” said Johnson. He cited the age of the existing plant, the cost of complying with existing or foreseeable environmental regulations, and the uncertainty of the cost of future regulation as reasons for choosing an alternative technology at Allen.

TVA considered a range of generation sources for the site, including wind, solar, biomass, and various natural gas configurations. “The gas combined-cycle option was the best match to TVA’s statutory standards that call for us to achieve the lowest system cost, and deliver power reliably at the lowest feasible cost to consumers, while also meeting system-wide needs,” Johnson explained.

During Johnson’s report to the board, he touched on several topics including TVA’s continued emphasis on cleaner energy sources, stewardship and economic development. As of 2013, nearly half of TVA’s electricity was from clean energy sources and carbon emissions are more than 30 percent below 2005 levels. Last fiscal year, 16 percent of TVA’s power supply came from renewable energy sources including solar, wind and hydro.

“As we achieve top quartile in industrial rates in the Valley, we’re seeing record capital investment of nearly $8 billion dollars,” Johnson said. This has helped create and retain 52,000 jobs so far this year and helped foster economic opportunity across the region.”

The Tennessee Valley Authority is a corporate agency of the United States that provides electricity for business customers and local power distributors serving 9 million people in parts of seven southeastern states. TVA receives no taxpayer funding, deriving virtually all of its revenues from sales of electricity. In addition to operating and investing its revenues in its electric system, TVA provides flood control, navigation and land management for the Tennessee River system and assists local power companies and state and local governments with economic development and job creation.

SurfKY News
Information provided by Gail Rymer

e-max.it: your social media marketing partner

LIKE SurfKY on Facebook - Click here to LIKE us now.

© Copyright 2015 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story on social media.

In Other News...

Madisonville Miners to Battle Dubois for Championship Tonight

HUNTINGBURG, Ind. (7/31/15) — Host Dubois County edged Madisonville 4-3 in the second game of the Ohio Valley League… Read More

Fairgoers Enjoy Fair Weather Thursday Night

HOPKINS COUNTY, Ky. (7/31/15) — Fairgoers seemed to enjoy Thursday night’s rain-free weather that provided an… Read More
1 DOW 17,689.86
-56.12 (-0.32%)    
2 S&P 2,103.84
-4.79 (-0.23%)    
3 NASDAQ 5,128.28
-0.50 (-0.01%)    

Most Read This Week

July 27, 2015 5774

Death of Central City Man in Dawson Springs Under…

by SurfKY News
July 27, 2015 3755

School System Announces Free Lunch/Breakfast at…

by SurfKY News
July 30, 2015 3079

Webster Man Leads Police on Chase through Parts…

by SurfKY News
July 31, 2015 3047

Miss Hopkins County Fair 2015 Chosen

by Tammy Holloway, SurfKY News
July 28, 2015 2494

Hanson, Owensboro, Bowling Green Youths Win at…

by Tammy Holloway, SurfKY News

Most Read This Month

July 17, 2015 16174

Muhlenberg Most Wanted - Top 10

by SurfKY News
July 23, 2015 15130

UPDATE: Family Confirms Body of Missing Teen…

by Shawn Freels, SurfKY News

Stories Trending Now

July 31, 2015 3047

Miss Hopkins County Fair 2015 Chosen

by Tammy Holloway, SurfKY News
July 31, 2015 1454

Little Miss, Mister Hopkins County Fair Chosen

by Tammy Holloway, SurfKY News
July 31, 2015 1012

State Fair President Commends Hopkins County Fair…

by Tammy Holloway, SurfKY News
July 31, 2015 888

Hopkins District Court Fines Handed Down

by SurfKY News
July 31, 2015 609

Henderson Woman Faces Rape Charges

by SurfKY News
July 31, 2015 536

Hopkins County Sheriff's Reports Released

by SurfKY News
July 31, 2015 519

A.G. Conway Announces Two Cybercrimes Arrests for…

by SurfKY News
July 31, 2015 478

House of Onyx's Crystal Gallery Opens in…

by SurfKY News
July 31, 2015 465

Four Wheeler Pursuit Results in Charges

by SurfKY News
July 31, 2015 433

One Injured in Three-Vehicle Collision

by SurfKY News