ky trans 300DAVIESS COUNTY, Ky. (7/10/14) — A contractor for the Kentucky Transportation Cabinet plans a traffic shift and detour for eastbound traffic along US 60/The Wendell Ford Expressway in Daviess County Saturday, July 12, 2014.

This planned traffic shift, lane restriction and detour is part of ongoing work along the US 60 Extension Project east of Owensboro.

There will be a shift for US 60 Eastbound traffic at mile point 18.7 near the Kentucky 54 Interchange. US 60 eastbound traffic will be moved onto a section of the new extension, then travel along the Kentucky 603/Pleasant Valley Road Connector.

US 60 Eastbound Traffic will then use the Kentucky 603/Pleasant Valley Road Connector to return to the existing US 60 Eastbound lanes. This generally follows the same route as Kentucky 54 ramp traffic to US 60 eastbound in recent weeks.

Signs, Variable Message Boards and other traffic control devices will be used to aid traffic in this movement.

Additionally, Pleasant Valley Road will be closed from the intersection with Hayden Road to the US 60 Exit Ramp at Kentucky 603. This is to allow uninterrupted movement of US 60 Eastbound traffic onto Kentucky 603.

This traffic shift and detour is expected to be implemented sometime on the morning of Saturday, July 12, 2014.

Motorists traveling US 60 in this area should be alert for crews preparing and placing traffic control equipment and structures as the shift approaches. Motorists should also be alert for changes in traffic flow created by this new long-term detour configuration.

Eastbound US 60 traffic will be restricted to one lane along this detour.

Westbound US 60 traffic will be restricted to one lane along the section between the Kentucky 603/Pleasant Valley Road Connector and the Kentucky 54 interchange. The lane restrictions and the additional 1.6 miles of travel with turns for eastbound motorists may create traffic delays, particularly during peak travel periods.

About 18,000 vehicles normally travel this section of US 60/The Wendell Ford Expressway in an average day.

This traffic shift is to allow construction of connections between the existing roadway and the new roadway at the west end of the US 60 Extension Project.

Yager Materials is the prime contractor on both phases of the $72.9 million US 60 Extension. The contractor has indicated that with good weather during this construction season traffic could be moved to the extension late this year with a variety of finish work continuing into 2015.

The new 4-lane highway is aimed at providing improved connectivity between Owensboro and the William Natcher Bridge which carries traffic along US 231 to Interstate 64 in Indiana.

SurfKY News
Information provided by Keith Todd

LIKE SurfKY on Facebook - Click here to LIKE us now.

© Copyright 2015 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story on social media.

Posted on 2/2/14
3/13 - 16
1 DOW 17,875.70
-100.61 (-0.56%)    
2 S&P 2,075.67
-10.57 (-0.51%)    
3 NASDAQ 4,918.96
-28.49 (-0.58%)    
3/13 - 16

Most Read This Week

March 27, 2015 5980

Three Arrested during Execution of Search…

by Madisonville Police Department/Hopkins County Detention Center
March 25, 2015 5491

Fazoli's, Roses Coming to Madisonville

by Amber Averitt, SurfKY News
March 24, 2015 5213

One Dies, Another Injured in Mortons Gap Traffic…

by Deputy Heath Owens
March 25, 2015 5150

Grand Jury Finds No Criminal Wrongdoing in Bean…

by Doreen Dennis, SurfKY News
March 24, 2015 4307

UPDATE: One Injured in Hopkinsville Road Accident

by Doreen Dennis, SurfKY News
March 30, 2015 4181

Man Charged with Child Abuse After Allegedly…

by Madisonville Police Department

Most Read This Month

March 09, 2015 13969

Multi-Agency Drug Bust Results in $1 Million Meth…

by KSP DESI
March 02, 2015 11660

Madisonville Teen Faces Numerous Drug Charges

by Madisonville Police Department/Hopkins County Detention Center

Stories Trending Today

March 30, 2015 4181

Man Charged with Child Abuse After Allegedly…

by Madisonville Police Department
March 30, 2015 2428

Juvenile Arrested for Cruelty to Animals

by Hopkins County Sheriff's Office
March 30, 2015 2262

Man Charged for Selling Drugs from Red Cardinal…

by Madisonville Police Department
March 30, 2015 2218

Two Charged in Bremen Meth Bust

by Sheriff Curtis McGehee
March 30, 2015 2031

Report of Suspicious Man Ends with PI, Meth…

by Madisonville Police Department
March 29, 2015 1355

Huge Turnout Joins to Support Shanice Bean Family

by Tammy Holloway, SurfKY News
March 30, 2015 1178

Madisonville Police Arrest Reports - March 30,…

by Madisonville Police Department
March 31, 2015 942

Happenings and Meetings - Hopkins County

by Amber Averitt, SurfKY News
March 30, 2015 911

Hopkins County Sheriff's Arrest Reports

by Hopkins County Sheriff's Office
March 30, 2015 776

Easter Cuties Pageant Raises Funds for Shanice…

by Tammy Holloway, SurfKY News