ky trans 300DAVIESS COUNTY, Ky. (7/10/14) — A contractor for the Kentucky Transportation Cabinet plans a traffic shift and detour for eastbound traffic along US 60/The Wendell Ford Expressway in Daviess County Saturday, July 12, 2014.

This planned traffic shift, lane restriction and detour is part of ongoing work along the US 60 Extension Project east of Owensboro.

There will be a shift for US 60 Eastbound traffic at mile point 18.7 near the Kentucky 54 Interchange. US 60 eastbound traffic will be moved onto a section of the new extension, then travel along the Kentucky 603/Pleasant Valley Road Connector.

US 60 Eastbound Traffic will then use the Kentucky 603/Pleasant Valley Road Connector to return to the existing US 60 Eastbound lanes. This generally follows the same route as Kentucky 54 ramp traffic to US 60 eastbound in recent weeks.

Signs, Variable Message Boards and other traffic control devices will be used to aid traffic in this movement.

Additionally, Pleasant Valley Road will be closed from the intersection with Hayden Road to the US 60 Exit Ramp at Kentucky 603. This is to allow uninterrupted movement of US 60 Eastbound traffic onto Kentucky 603.

This traffic shift and detour is expected to be implemented sometime on the morning of Saturday, July 12, 2014.

Motorists traveling US 60 in this area should be alert for crews preparing and placing traffic control equipment and structures as the shift approaches. Motorists should also be alert for changes in traffic flow created by this new long-term detour configuration.

Eastbound US 60 traffic will be restricted to one lane along this detour.

Westbound US 60 traffic will be restricted to one lane along the section between the Kentucky 603/Pleasant Valley Road Connector and the Kentucky 54 interchange. The lane restrictions and the additional 1.6 miles of travel with turns for eastbound motorists may create traffic delays, particularly during peak travel periods.

About 18,000 vehicles normally travel this section of US 60/The Wendell Ford Expressway in an average day.

This traffic shift is to allow construction of connections between the existing roadway and the new roadway at the west end of the US 60 Extension Project.

Yager Materials is the prime contractor on both phases of the $72.9 million US 60 Extension. The contractor has indicated that with good weather during this construction season traffic could be moved to the extension late this year with a variety of finish work continuing into 2015.

The new 4-lane highway is aimed at providing improved connectivity between Owensboro and the William Natcher Bridge which carries traffic along US 231 to Interstate 64 in Indiana.

SurfKY News
Information provided by Keith Todd

e-max.it: your social media marketing partner

LIKE SurfKY on Facebook - Click here to LIKE us now.

© Copyright 2015 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story on social media.

In Other News...

Dawson Springs Police Reports Released

DAWSON SPRINGS, Ky. (8/3/15) — The Dawson Springs Police Department released the following reports Monday, Aug. 3.… Read More

Special Called Meeting Aug. 4, 2015

HOPKINS COUNTY, Ky. (8/3/15) — The Hopkins Fiscal Court Budget, Audit and Personnel Committee will have a special… Read More

Most Read This Week

July 30, 2015 4087

Webster Man Leads Police on Chase through Parts…

by SurfKY News
July 31, 2015 3957

Miss Hopkins County Fair 2015 Chosen

by Tammy Holloway, SurfKY News
August 01, 2015 2758

24th Annual Miss Teen Hopkins County Fair Pageant…

by Tammy Holloway, SurfKY News
July 29, 2015 2637

Crime Stoppers Top Most Wanted - July 29, 2015

by SurfKY News
August 01, 2015 2558

Little Miss, Mister Hopkins County Fair Chosen

by Tammy Holloway, SurfKY News

Most Read This Month

July 17, 2015 16936

Muhlenberg Most Wanted - Top 10

by SurfKY News
July 23, 2015 15909

UPDATE: Family Confirms Body of Missing Teen…

by Shawn Freels, SurfKY News

Stories Trending Now

August 04, 2015 2210

Hopkins School System Has More Hiring to Do

by Tammy Holloway, SurfKY News
August 03, 2015 1761

Tiniest Division of Hopkins County Fair Pageants…

by Tammy Holloway, SurfKY News
August 04, 2015 1592

No. 9 Steakhouse Owners Working to Rebuild Dream

by Doreen Dennis, SurfKY News
August 03, 2015 1569

Two Injured in Motorcycle Accident

by SurfKY News
August 04, 2015 1486

UPDATE: AT&T Engineers Identify Phone…

by Rita Dukes Smith, SurfKY News Director
August 03, 2015 1400

Man Accused of Using Craig's List to Encourage…

by SurfKY News
August 03, 2015 1191

Madisonville Police Reports Released

by SurfKY News
August 03, 2015 1179

Back To School Bash Brings Crowd to Mall

by Tammy Holloway, SurfKY News
August 03, 2015 1129

Two Vehicle Collision Injures One, Driver…

by SurfKY News
August 03, 2015 1015

Vehicle Accident Results in One Fatality

by SurfKY News