ky trans 300DAVIESS COUNTY, Ky. (7/10/14) — A contractor for the Kentucky Transportation Cabinet plans a traffic shift and detour for eastbound traffic along US 60/The Wendell Ford Expressway in Daviess County Saturday, July 12, 2014.

This planned traffic shift, lane restriction and detour is part of ongoing work along the US 60 Extension Project east of Owensboro.

There will be a shift for US 60 Eastbound traffic at mile point 18.7 near the Kentucky 54 Interchange. US 60 eastbound traffic will be moved onto a section of the new extension, then travel along the Kentucky 603/Pleasant Valley Road Connector.

US 60 Eastbound Traffic will then use the Kentucky 603/Pleasant Valley Road Connector to return to the existing US 60 Eastbound lanes. This generally follows the same route as Kentucky 54 ramp traffic to US 60 eastbound in recent weeks.

Signs, Variable Message Boards and other traffic control devices will be used to aid traffic in this movement.

Additionally, Pleasant Valley Road will be closed from the intersection with Hayden Road to the US 60 Exit Ramp at Kentucky 603. This is to allow uninterrupted movement of US 60 Eastbound traffic onto Kentucky 603.

This traffic shift and detour is expected to be implemented sometime on the morning of Saturday, July 12, 2014.

Motorists traveling US 60 in this area should be alert for crews preparing and placing traffic control equipment and structures as the shift approaches. Motorists should also be alert for changes in traffic flow created by this new long-term detour configuration.

Eastbound US 60 traffic will be restricted to one lane along this detour.

Westbound US 60 traffic will be restricted to one lane along the section between the Kentucky 603/Pleasant Valley Road Connector and the Kentucky 54 interchange. The lane restrictions and the additional 1.6 miles of travel with turns for eastbound motorists may create traffic delays, particularly during peak travel periods.

About 18,000 vehicles normally travel this section of US 60/The Wendell Ford Expressway in an average day.

This traffic shift is to allow construction of connections between the existing roadway and the new roadway at the west end of the US 60 Extension Project.

Yager Materials is the prime contractor on both phases of the $72.9 million US 60 Extension. The contractor has indicated that with good weather during this construction season traffic could be moved to the extension late this year with a variety of finish work continuing into 2015.

The new 4-lane highway is aimed at providing improved connectivity between Owensboro and the William Natcher Bridge which carries traffic along US 231 to Interstate 64 in Indiana.

SurfKY News
Information provided by Keith Todd

LIKE SurfKY on Facebook - Click here to LIKE us now.

© Copyright 2015 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story on social media.

In Other News...

Utility Tax Petition Signatures Put Choice before Voters; Board to Wait for November Election

GREENVILLE, Ky. (3/27/15) — The Muhlenberg County Clerk's office has completed the certification of Muhlenberg County… Read More

CC Lions Club to Award Two $500 Scholarships

CENTRAL CITY, Ky. (3/27/15) — The Central City Lions Club is offering graduating high school seniors living in… Read More

Most Read This Week

March 25, 2015 5118

Fazoli's, Roses Coming to Madisonville

by Amber Averitt, SurfKY News
March 24, 2015 4972

One Dies, Another Injured in Mortons Gap Traffic…

by Deputy Heath Owens
March 25, 2015 4897

Grand Jury Finds No Criminal Wrongdoing in Bean…

by Doreen Dennis, SurfKY News
March 27, 2015 4796

Three Arrested during Execution of Search…

by Madisonville Police Department/Hopkins County Detention Center
March 24, 2015 4104

UPDATE: One Injured in Hopkinsville Road Accident

by Doreen Dennis, SurfKY News
March 25, 2015 3836

Madisonville Man's Living Room Leap Lands Him in…

by Madisonville Police Department / Hopkins County Detention Center

Most Read This Month

March 09, 2015 13089

Multi-Agency Drug Bust Results in $1 Million Meth…

by KSP DESI
March 02, 2015 11438

Madisonville Teen Faces Numerous Drug Charges

by Madisonville Police Department/Hopkins County Detention Center

Stories Trending Today

March 27, 2015 4796

Three Arrested during Execution of Search…

by Madisonville Police Department/Hopkins County Detention Center
March 27, 2015 1996

MPD Searching for Man Accused of Nearly Running…

by Madisonville Police Department
March 27, 2015 1523

Family Loses Possessions, Dog in Sugg Street Fire

by Doreen Dennis, SurfKY News
March 27, 2015 1200

Hopkins Grand Jury Indictments Handed Down

by Karen McKnight
March 27, 2015 1099

Rehabber Explains Her Mission; Efforts Filmed by…

by Ron Sanders
March 27, 2015 992

Hopkins County Health Department Food Scores Thru…

by Barry Franklin
March 27, 2015 841

Madisonville Police Arrest Reports - March 27,…

by Madisonville Police Department
March 27, 2015 779

Sheriff Explains Numerous Duties of Office,…

by Ron Sanders
March 27, 2015 739

Work Continues on Madisonville's Downtown Plaza

by Rita Dukes Smith, SurfKY News Director
March 27, 2015 727

Utility Tax Petition Signatures Put Choice before…

by Charles W. Riley II, SurfKY News