Pick Your Community: | Hopkins | Muhlenberg | Daviess | Christian | Fayette | Henderson | Lakes | McCracken | Warren | Webster

Owensboro City Commission Hears from Transportation Cabinet

Owensboro Seal 01 300OWENSBORO, Ky. (6/9/13) – In its monthly work session on Tuesday, the Owensboro City Commission heard a special report from Kentucky Department of Transportation District 2 Chief District Engineer Kevin McClearn concerning the state of road projects in the Owensboro and Daviess County area.

According to McClearn, efforts to maintain and renovate sections of the Audubon Parkway are underway at this time, with a projected completion this fall. During the work session, Mayor Ron Payne brought the question concerning the state of the parkway, citing a goal by his administration to incorporate the Audubon Parkway as a spur of Interstate 69. McClearn stated that currently, the parkway is not up to Interstate standards, and that modifications have yet to be made to make the road interstate ready. There is currently an ongoing study by the Kentucky Department of Transportation to specify exactly where the Audubon Parkway falls short of Interstate standards, and to project costs of bringing the road’s condition to where it needs to be. Construction is currently anticipated to be completed in September.

The painting project on the Glover H. Cary Bridge, more commonly referred to as the “Blue Bridge,” was the focal point of the briefing. Currently approximately one-third of the truss section on the bridge is completed, with more of the paint job becoming apparent as contractors move on to the next section of bridge.

“I love the process where you can see the new color of the bridge, as opposed to the old color during the paint job,” said Mayor Ron Payne during the meeting. “It sure points out how necessary this was.”

The goal is to complete the whole truss section by November of this year, according to McClearn, and to reopen the bridge completely until April of 2014. At that time, contractors will return to work on the project, but will not close the bridge completely. Lane closures will take place, and the project will be completed in November of 2014.

Currently, there is a debate on whether to impose a weight restriction on the bridge, as concerns have been raised that heavy trucks and farm machinery traffic imposes more weight on the bridge than it was designed to handle. A decision hasn’t been made regarding imposing a weight restriction on the bridge, but according to McClearn, officials do not anticipate that a weight restriction will be necessary at this time. Safety inspections are conducted approximately every two years, so should weight become an issue, it could be addressed in the future.

Alex Reid
SurfKY News

© Copyright 2014 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story by using one of the social media links below.

3/12 - 718 switched from reg 2 to hopkins only
3/13 - 16

Stock Report

1 DOW 16,943.81
0.00 (0.00%)    
2 S&P 1,967.51
+2.83 (0.14%)    
3 NASDAQ 4,415.49
0.00 (0.00%)    
3/12 - 718 switched from reg 2 to hopkins only
3/13 - 16
3/12 - 718 switched from reg 2 to hopkins only
3/13 - 16

In Other News...

Murray-Calloway County Hospital Supports Regional Stroke Camp, Seeks Participants and Volunteers

MURRAY, Ky. (7/13/14) — The Murray Calloway Endowment for Healthcare at Murray-Calloway County Hospital will be hosting… Read More

Dr. John Yezerski Joins Drs. Charette, Morgan and Compton to Form Murray OrthopAedics

MURRAY, Ky. (7/12/14) — Orthopedic surgeon Dr. John Yezerski is joining the office of Charette, Morgan and Compton… Read More
3/12 - 718 switched from reg 2 to hopkins only
3/13 - 16

Most Read This Week (Site-Wide)

July 11, 2014 5814

Madisonville Kmart to Close in October

in Top Stories by Ami Clayton, SurfKY News
July 09, 2014 4006

Madisonville Woman Arrested for Alleged…

in Top Stories by Madisonville Police Department
July 11, 2014 3938

Hopkins County Health Department Food…

in News by Lisa Miller
July 09, 2014 3281

Crime Stoppers Top Most Wanted - July 9,…

in Top Stories by Crime Stoppers
July 11, 2014 2688

Local Man Dies After Bike Collides With…

in Top Stories by Robert D. Littlepage

Most Read Stories from Hopkins County

July 11, 2014 5814

Madisonville Kmart to Close in October

in Top Stories by Ami Clayton, SurfKY News
July 09, 2014 4006

Madisonville Woman Arrested for Alleged…

in Top Stories by Madisonville Police Department
July 09, 2014 3281

Crime Stoppers Top Most Wanted - July 9,…

in Top Stories by Crime Stoppers
July 11, 2014 2688

Local Man Dies After Bike Collides With…

in Top Stories by Robert D. Littlepage
July 10, 2014 1806

UPDATED: MFD Battles Blaze on South…

in Top Stories by Rita Dukes Smith, SurfKY News Director

Most Read Stories from Owensboro

July 09, 2014 1255

Passport Health Plan Announces Contract…

in News by Jill J Bell
July 11, 2014 989

Owensboro Police Department Reports…

in News by Dennis Beard, SurfKY News
July 09, 2014 957

Owensboro Police Department Reports…

in News by Dennis Beard, SurfKY News
July 10, 2014 917

Daviess County Traffic Advisory

in News by Keith Todd
July 09, 2014 915

Edge Ice Center Offering Summertime…

in News by Brittni Bunn

Most Read Stories from Muhlenberg County

July 11, 2014 1605

Muhlenberg District Court Fines Handed…

in Top Stories by Charles W. Riley II, SurfKY News
July 09, 2014 1567

Business Spotlight - My Sister's Stuff

in Top Stories by Charles W. Riley II, SurfKY News
July 12, 2014 967

July Chamber Meeting

in Top Stories by Charles W. Riley II, SurfKY News

SurfKY News Group, Inc. Central Office & Printing Division
1125 Nebo Rd.  •  Madisonville, KY 42431  •  270.452.2249 (fax)
Main Number: 270.452.2727 (phone)  •  Printing Division Direct Line: 270.821.8600 (phone)

SurfKY Owensboro News Bureau
920 Frederica St. / Suite 210  •  Owensboro, KY 42301  •  270.683-8060 (phone)


Contact a member of our staff: www.surfky.com/contact
Copyright © 2014 SurfKY News Group, Inc.  •  Terms of Use  •  Site Map

social 06social 21social 22social 04social 03