ky trans cab 300WESTERN KENTUCKY (6/5/12) - Kentucky Transportation Cabinet (KYTC) engineers are developing alternate alignments for reconstruction of U.S. 641 around Fredonia and to Eddyville.

Crews have completed most of their survey work along a wide swath between the two communities, apparently prompting speculation that the new highway will run through Fredonia, displacing a number of businesses.

“We have not selected a route,” said KYTC Chief District Engineer LeFevre said. “However, we are required by law to look at all options, to weigh them based on the information we’ve gathered, and develop alternatives that best provide for traffic flow while minimizing the impact on the community.”

Project engineers and designers will develop alternate alignments for the Fredonia-Eddyville section for review by area citizens in a public meeting. LeFevre said would likely be scheduled sometime in early 2013.

“This section has a number of challenges, including several historic cemeteries that will have to be avoided, and an environmentally sensitive underground water feature that somewhat restricts where the highway can go,” LeFevre said. “Surveyors have been checking property lines along a wide swath near Fredonia to aid in the development of alternate routes. Our goal is to construct a highway that improves safety for the public while being sensitive to the environment and the people who live along the proposed route.”

Construction has already started between Marion and Fredonia for “grade and drain” work along U.S. 641 in Crittenden County. The $18 million grade and drain along the 5.5-mile project is the first step in widening U.S. 641 from Marion to Eddyville.

The new four-lane is aimed at helping attract new investment and jobs, and providing an improved transportation route for existing industries and the public.

The present project area extends from just south of Marion to the northern edge of Fredonia near the Crittenden-Caldwell county line. The 5.5-mile section is expected to be ready for paving in late 2014 or early 2015.

Plans call for the new four-lane highway to cross the existing two-lane U.S. 641 between the Fredonia city limits and the Caldwell-Crittenden county line. The highway will route west of Fredonia, then roughly follow the existing highway to within a few miles of Eddyville. When completed, the new highway will provide an improved connection to Interstate 69 and I-24.

The estimated cost of the entire 16-mile project is about $109 million – $39 million for the Marion to Fredonia section and $70 million for the section from Fredonia to Eddyville.

SurfKY News
Information provided by Keith Todd

e-max.it: your social media marketing partner

LIKE SurfKY on Facebook - Click here to LIKE us now.

© Copyright 2015 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story on social media.

In Other News...

VIDEO: Sparks Fly Over Hanson Rezoning Issue

HANSON, Ky. (05/26/15) – There was standing room only as the city of Hanson met for its regularly scheduled meeting… Read More

Baptist Health Paducah to Host National Cancer Survivors Day

PADUCAH, Ky. (5/27/15) — Baptist Health Paducah is hosting National Cancer Survivors Day from 2 to 4 p.m. Sunday, June… Read More

Most Read This Week

May 22, 2015 7704

Madisonville Man Charged with First-Degree Rape

by SurfKY News
May 23, 2015 7544

Missing 5-Year-Old Boy Found

by Doreen Dennis, SurfKY News
May 27, 2015 5278

VIDEO: Sparks Fly Over Hanson Rezoning Issue

by Tammy Holloway, SurfKY News
May 25, 2015 3536

Can Sunscreen Save Your Life?

by Melissa Patrick
May 26, 2015 2807

Mandarin House Gearing Up to Open Soon

by Gary Gates, SurfKY News

Most Read This Month

May 15, 2015 10888

New Madisonville Business In Full Operation Soon

by Tammy Holloway, SurfKY News
May 22, 2015 7704

Madisonville Man Charged with First-Degree Rape

by SurfKY News

Stories Trending Now

May 27, 2015 5278

VIDEO: Sparks Fly Over Hanson Rezoning Issue

by Tammy Holloway, SurfKY News
May 27, 2015 2287

Midnight Ride on Rabbit Ridge Ends in Jail

by SurfKY News
May 27, 2015 1413

Crime Stoppers Top Most Wanted - May 27, 2015

by Crime Stoppers
May 27, 2015 1018

Crime Stoppers Fugitive of the Week – May 27,…

by Hopkinsville – Christian County Crime Stoppers
May 27, 2015 544

Hopkins County Sheriff's Reports Released

by SurfKY News
May 27, 2015 453

Anonymous Tip Results in Drug Charges

by SurfKY News
May 27, 2015 344

Two Vehicle Collision Sends One to Hospital

by McCracken County Sheriff's Department