Pick Your Community: | Hopkins | Muhlenberg | Daviess | Christian | Fayette | Henderson | Lakes | McCracken | Warren | Webster
Davis Motor Sales banner ad

Daviess County Traffic Advisory

ky trans 300DAVIESS COUNTY, Ky. (7/10/14) — A contractor for the Kentucky Transportation Cabinet plans a traffic shift and detour for eastbound traffic along US 60/The Wendell Ford Expressway in Daviess County Saturday, July 12, 2014.

This planned traffic shift, lane restriction and detour is part of ongoing work along the US 60 Extension Project east of Owensboro.

There will be a shift for US 60 Eastbound traffic at mile point 18.7 near the Kentucky 54 Interchange. US 60 eastbound traffic will be moved onto a section of the new extension, then travel along the Kentucky 603/Pleasant Valley Road Connector.

US 60 Eastbound Traffic will then use the Kentucky 603/Pleasant Valley Road Connector to return to the existing US 60 Eastbound lanes. This generally follows the same route as Kentucky 54 ramp traffic to US 60 eastbound in recent weeks.

Signs, Variable Message Boards and other traffic control devices will be used to aid traffic in this movement.

Additionally, Pleasant Valley Road will be closed from the intersection with Hayden Road to the US 60 Exit Ramp at Kentucky 603. This is to allow uninterrupted movement of US 60 Eastbound traffic onto Kentucky 603.

This traffic shift and detour is expected to be implemented sometime on the morning of Saturday, July 12, 2014.

Motorists traveling US 60 in this area should be alert for crews preparing and placing traffic control equipment and structures as the shift approaches. Motorists should also be alert for changes in traffic flow created by this new long-term detour configuration.

Eastbound US 60 traffic will be restricted to one lane along this detour.

Westbound US 60 traffic will be restricted to one lane along the section between the Kentucky 603/Pleasant Valley Road Connector and the Kentucky 54 interchange. The lane restrictions and the additional 1.6 miles of travel with turns for eastbound motorists may create traffic delays, particularly during peak travel periods.

About 18,000 vehicles normally travel this section of US 60/The Wendell Ford Expressway in an average day.

This traffic shift is to allow construction of connections between the existing roadway and the new roadway at the west end of the US 60 Extension Project.

Yager Materials is the prime contractor on both phases of the $72.9 million US 60 Extension. The contractor has indicated that with good weather during this construction season traffic could be moved to the extension late this year with a variety of finish work continuing into 2015.

The new 4-lane highway is aimed at providing improved connectivity between Owensboro and the William Natcher Bridge which carries traffic along US 231 to Interstate 64 in Indiana.

SurfKY News
Information provided by Keith Todd

© Copyright 2014 SurfKY News Group, Inc. All rights reserved. This material may not be published, broadcast, or rewritten without permission. SurfKY News encourages you to share this story by using one of the social media links below.

Started 11/8/2013
Started 11/8/2013
Started 11/8/2013
Started 11/8/2013
Started 11/8/2013
Started 11/8/2013

In Other News...

Happenings and Meetings - Hopkins County

HOPKINS COUNTY, Ky. (8/30/14) — The following meetings and events are scheduled for the following week: Tradewater… Read More

Owensboro Police Department Activity Reports

OWENSBORO, Ky. (8/29/14) — Owensboro Police Department reported the following recent arrests and citations: Jonathan… Read More
Started 11/8/2013
Started 11/8/2013

Most Read This Week (Site-Wide)

August 29, 2014 6179

Luke's Flea Market Vendors' Home Away…

in News by Charles W. Riley II, SurfKY News
August 26, 2014 4918

Owensboro Board of Commissioners…

in News by Beth Cecil
August 28, 2014 4745

Police Pursuit Spans Parts of Northern…

in Top Stories by Alex Piper, MCSO
August 26, 2014 4467

Family Has Close Call with Tornado

in Top Stories by Paul McRee, SurfKY News
August 26, 2014 4155

City Street Closures on Strawbridge and…

in News by Abby Shelton

Most Read Stories from Hopkins County

August 26, 2014 2176

Two People Injured When Vehicle Overturns…

in Top Stories by Matt Sanderson
August 27, 2014 1589

Crime Stoppers Top Most Wanted - August…

in Top Stories by Crime Stoppers
August 29, 2014 702

MCC Announces New Board Members

in Top Stories by Joyce Riggs
August 26, 2014 684

Whitfield Presents $1 Million FEMA Check…

in Top Stories by Amber Averitt, SurfKY News
August 26, 2014 609

McCay Chiropractor Presents Relay For…

in Top Stories by Amber Averitt, SurfKY News

Most Read Stories from Owensboro

August 26, 2014 4918

Owensboro Board of Commissioners…

in News by Beth Cecil
August 26, 2014 4155

City Street Closures on Strawbridge and…

in News by Abby Shelton
August 26, 2014 2030

City Hall, Transit, Sanitation Schedules…

in News by Abby Shelton
August 27, 2014 1559

Owensboro Police Conduct Investigations

in News by Dennis Beard, SurfKY News
August 26, 2014 1516

Happy Birthday to the Edge Ice Center

in News by Brittni Bunn

Most Read Stories from Muhlenberg County

August 28, 2014 4745

Police Pursuit Spans Parts of Northern…

in Top Stories by Alex Piper, MCSO
August 26, 2014 4467

Family Has Close Call with Tornado

in Top Stories by Paul McRee, SurfKY News
August 27, 2014 3796

Five Injured in Three-Vehicle Accident

in Top Stories by Charles W. Riley II, SurfKY News
August 26, 2014 2654

Annual Everly Brothers Cruise In…

in Top Stories by Paul McRee, SurfKY News
August 27, 2014 2088

Muhlenberg Job Corps Former Student…

in Top Stories by Karen Robinson

SurfKY News Group, Inc. Central Office & Printing Division
1125 Nebo Rd.  •  Madisonville, KY 42431  •  270.452.2249 (fax)
Main Number: 270.452.2727 (phone)  •  Printing Division Direct Line: 270.821.8600 (phone)

SurfKY Owensboro News Bureau
920 Frederica St. / Suite 210  •  Owensboro, KY 42301  •  270.683-8060 (phone)


Contact a member of our staff: www.surfky.com/contact
Copyright © 2014 SurfKY News Group, Inc.  •  Terms of Use  •  Site Map

social 03social 04social 22social 21social 06