men at workCHRISTIAN COUNTY, Ky. (7/15/19) — A contractor for the Kentucky Transportation Cabinet plans to temporarily close the Kentucky 800 Crofton Exit 23 southbound entry ramp to the Breathitt-Pennyrile Parkway in Christian County starting Monday, July 22.

The southbound entry ramp from Crofton Exit 23 Interchange will close at approximately 6 a.m. July 22 to allow rehab work and paving. The southbound ramp from Kentucky 800 to the Pennyrile Parkway southbound lanes at Crofton will be closed for approximately 15 days, KYTC Spokesman Keith Todd reported.

Message boards will be placed to alert the public with the southbound ramp closure. Motorists may detour via U.S. 41-S to connect with the Pennyrile at Exit 11.

This southbound entry ramp closure is part of a reconstruction project along the Pennyrile Parkway that runs from about a mile north of the Kentucky 2642 overpass starting at milepoint 16.556 extending northward to near the U.S. 41 Ramp Overpass at milepoint 29.9, a distance of 13.344 miles.

The project is divided into about 6 phases spread over about 18 months, Todd said. Hall Contracting of KY INC., is the prime contractor on this $43.2 million rehab project. The Pennyrile Parkway has been designated as a Future I-169 Spur Corridor.

SurfKY News

sitelogosm© Copyright 2008 - 2019 SurfKY News Group, Inc. All rights reserved.
This material may not be published, broadcast, or rewritten without permission.

Click here to subscribe to receive daily updates by email.

Most Read This Week...

 

Most Read This Month

Mostly Cloudy

92°F

Christian, KY

Mostly Cloudy

Humidity: 49%

Wind: 3.11 m/h

  • 20 Aug 2019

    Thunderstorms 98°F 75°F

  • 21 Aug 2019

    Thunderstorms 92°F 74°F

Weather brought to you by

Market Report brought to you by

 

Market Report

Stories Trending Today