road traffic conesHENDERSON, Ky. (7/8/19) — A milling and paving project along U.S. 41 through Henderson is substantially complete.
 
The Kentucky Transportation Cabinet plans one more round of lane restrictions along the project area starting around 8 a.m. Tuesday, July 9.
 
Traffic will be restricted to one lane in short sections along U.S. 41 between the Kentucky 425 Henderson Bypass at the End of Interstate 69 and the U.S. 60 North Cloverleaf at Henderson to allow paving testing.  Traffic will move to the left-hand or passing lane in this mobile work zone.
 
The project along U.S. 41 runs from milepoint 11.525 at the Interstate 69/U.S. 41/Kentucky 425 Henderson Bypass Interchange extending along U.S. 41 northward through  the Audubon Parkway Interchange, the Kentucky 351/Zion Road Henderson Interchange, and the U.S. 41/U.S. 60 North Henderson Cloverleaf to near the Tumbleweed Restaurant entrance at mile point 16.047, a distance of about 4.5 miles.
 
Motorists should be alert for slowing and merging traffic. Appropriate caution is required where equipment, flaggers and other personnel are along the roadway in close proximity to traffic flow.
 
The pavement testing is expected to be complete by about 1 p.m. Tuesday.
 
The contractor with then work to complete placement of thermal pavement markings to finish out the project.

SurfKY News

Information by Keith Todd

sitelogosm© Copyright 2008 - 2019 SurfKY News Group, Inc. All rights reserved.
This material may not be published, broadcast, or rewritten without permission.

Click here to subscribe to receive daily updates by email.

Partly Cloudy

68°F

Henderson, KY

Partly Cloudy

Humidity: 68%

Wind: 1.24 m/h

  • 20 Oct 2019

    Scattered Showers 71°F 57°F

  • 21 Oct 2019

    Showers 79°F 56°F

Weather brought to you by

Market Report brought to you by

Market Report

Stories Trending Today